Existing watch model
Start with a catalogue reference and specify the branding, color and configuration changes to review.
Browse reference models →ROLENDO / SAMPLING
Plan samples for private label watches, new OEM/ODM designs or standalone watch components. Define what the sample needs to demonstrate before committing to production.

Start with a catalogue reference and specify the branding, color and configuration changes to review.
Browse reference models →Share drawings or a product concept to discuss design development, component selection and tooling needs.
Explore OEM / ODM →Request a dial, strap, bracelet or case sample with the relevant dimensions, interfaces and finish requirements.
Watch Dial Manufacturer →Watch Strap & Bracelet Manufacturer →Watch Case Manufacturer →Send drawings or reference models, artwork, key specifications, sample quantities and the intended bulk order.
Agree sample deliverables, tooling needs, costs, timing and which features can be evaluated at this stage.
Review the sample against the agreed drawing, configuration and appearance references.
List required revisions clearly. Confirm any additional costs and timing before a further sample round.
Record the approved specification and sample reference, then confirm bulk-order quantities, inspection criteria and schedule.

Watch-project timing shown above; component samples are quoted separately. Confirm the schedule after specification and sample review. Shipping time is separate.
FAQ
The details that help you take the next step.
Yes. Discuss standalone dial, strap, bracelet or case samples with drawings, fit requirements and the expected production quantity.
Sample and shipping charges depend on the specification. Any credit toward a later bulk order is agreed with the quotation.
Watch sampling: 30–45 calendar days. Bulk production: 45–60 calendar days. Confirm the project schedule after reviewing specifications, tooling and sample approval; shipping time is separate. Component samples are scheduled separately for their drawings, tooling and finish.
No. Sample approval records the agreed product reference. Bulk production requires separate confirmation of specifications, quantities, commercial terms and scheduling.